Hangzhou Xiasha economic development zone
Starting time:2015, 01(Form)
The wastewater treatment station is located in Paojiang industrial zone, Shaoxing. This company specializes in knitting manufacturing. The designed treated wastewater is 5000t/d, the wastewater takes an area of 4000m2. The total investment is 13.25 million Yuan.
Treatment Process:
Treated water quality information
Type | Amount(t/d) | CODcr(mg/L) | pH |
Vacuum pump wastewater | 5 | 20000~30000 | 6~9 |
Refined wastewater | 5~10 | 60000 | ≥13 |
Sanitary wastewater | 150 | 250 | 6~9 |
Discharge standard | GB8978-1996 |